Kudankulam Nuclear Power Plant is expected to reach its total capacity of six thousand megawatt by 2027. Currently, Units 1 and 2 of the plant having 1000 megawatt capacity are in operation, while the remaining four units with a total of 1000 megawatt each are under construction.
This was stated by the Minister of State in Prime Minsiter’s officer Dr. Jitendra Singh in a written reply in the Rajya Sabha today. (AIR NEWS)